Business System

contact us

023-81392211

No. 115-3-2-1, Songpai Road, Yubei District, Chongqing China

Business System

ZTEPBusiness SystemHazardous Waste Disposal

Wansheng Integrated Disposal Base Project

Founded in October 2015, Wansheng Integrated Disposal Base Project is constructed and operated by Chongqing TIANXUAN Environmental Protection Technology Co., Ltd. (a wholly-owned subsidiary of Xin Zhongtian Environmental Protection Co., Ltd.) with total investment of 400 million Chinese yuan. The project includes two phases: the construction device of 1st phase mainly includes 30KT/year incineration capacity, 10KT/year physical treatment, 30KT/year solid waste landfill disposal, and 300,000 m³landfill warehouse with total investment of 200 million Chinese yuan; the additional device of 2nd phase mainly includes 30KT/year incineration capacity, 10KT/year physical treatment, 50KT/year reutilization, and 700,000 m³landfill warehouse with total investment capital of 200 million Chinese yuan. After the project is completed, industrial wastes disposal capacity can reach 150KT/year, including 60KT/year incineration capacity, 10KT/year physical treatment, 30KT/year solid waste disposal, 50KT/year reutilization, and 1,000,000 m³landfill yard.