Founded in October 2015, Wansheng Integrated Disposal Base Project is constructed and operated by Chongqing TIANXUAN Environmental Protection Technology Co., Ltd. (a wholly-owned subsidiary of Xin Zhongtian Environmental Protection Co., Ltd.) with total investment of 400 million Chinese yuan. The project includes two phases: the construction device of 1st phase mainly includes 30KT/year incineration capacity, 10KT/year physical treatment, 30KT/year solid waste landfill disposal, and 300,000 m³landfill warehouse with total investment of 200 million Chinese yuan; the additional device of 2nd phase mainly includes 30KT/year incineration capacity, 10KT/year physical treatment, 50KT/year reutilization, and 700,000 m³landfill warehouse with total investment capital of 200 million Chinese yuan. After the project is completed, industrial wastes disposal capacity can reach 150KT/year, including 60KT/year incineration capacity, 10KT/year physical treatment, 30KT/year solid waste disposal, 50KT/year reutilization, and 1,000,000 m³landfill yard.